Client
Taylor AU
Location
Bellevue Hill, NSW
Year Completed
2024
Duration
4 years
Project Type
Stonemasonry

The Scots College, Bellevue Hill

Project Overview

RJC Group delivered extensive stonemasonry works as part of the redevelopment and expansion of the heritage-listed John Cunningham Student Centre at The Scots College. The project involved the fabrication and installation of new sandstone façades and ornate architectural elements designed to integrate with the campus’s existing Scottish baronial architecture.

  • Structural demolition and extension of floor slabs with formation of atrium voids
  • Fabrication and installation of sandstone facades to interior and exterior elevations in Scottish baronial style
  • Fabrication of detailed architectural stone elements matched to existing campus detailing
  • Construction and installation of ornate entry portals
  • Achieving precise aesthetic consistency between new sandstone works and the existing heritage campus buildings
  • Maintaining visual and material continuity across architectural styles spanning different construction periods
  • Delivering a long-term staged scope within an operational school environment while maintaining safety for staff and students
  • Coordinating a four-year delivery timeline alongside the broader construction schedule managed by the principal contractor

RJC Group fabricated and installed sandstone elements to align with the campus’s existing architectural detailing, ensuring continuity across the development. Works were staged to suit school operations, site constraints and the broader construction schedule, with close coordination maintained throughout with the builder and project team.

Every stage of the works was planned to support safe delivery within an active school environment while meeting project requirements and preserving the architectural character of the campus.

  • Flawless aesthetic integration of new sandstone facades with the existing heritage campus buildings
  • Intricate stone carving and facade assembly delivered in line with the period architectural detail of the campus
  • All works delivered safely within an operating school campus through staged scheduling and rigorous safety controls
  • Long-term enhancement of campus facilities while preserving the school's architectural heritage
Scope of Works Arrow
  • Structural demolition and extension of floor slabs with formation of atrium voids
  • Fabrication and installation of sandstone facades to interior and exterior elevations in Scottish baronial style
  • Fabrication of detailed architectural stone elements matched to existing campus detailing
  • Construction and installation of ornate entry portals
Project Considerations Arrow
  • Achieving precise aesthetic consistency between new sandstone works and the existing heritage campus buildings
  • Maintaining visual and material continuity across architectural styles spanning different construction periods
  • Delivering a long-term staged scope within an operational school environment while maintaining safety for staff and students
  • Coordinating a four-year delivery timeline alongside the broader construction schedule managed by the principal contractor
Delivery & Approach Arrow

RJC Group fabricated and installed sandstone elements to align with the campus’s existing architectural detailing, ensuring continuity across the development. Works were staged to suit school operations, site constraints and the broader construction schedule, with close coordination maintained throughout with the builder and project team.

Every stage of the works was planned to support safe delivery within an active school environment while meeting project requirements and preserving the architectural character of the campus.

Key Outcomes Arrow
  • Flawless aesthetic integration of new sandstone facades with the existing heritage campus buildings
  • Intricate stone carving and facade assembly delivered in line with the period architectural detail of the campus
  • All works delivered safely within an operating school campus through staged scheduling and rigorous safety controls
  • Long-term enhancement of campus facilities while preserving the school's architectural heritage
Ornate sandstone entry portal detail at The Scots College, Bellevue Hill - RJC Group stonemasonry
Heritage timber door with sandstone surround at The Scots College, Bellevue Hill - RJC Group
Full sandstone facade of The Scots College John Cunningham Student Centre, Bellevue Hill - RJC Group
Sandstone archway interior at The Scots College John Cunningham Student Centre - RJC Group
Sandstone colonnade and heritage detailing at The Scots College, Bellevue Hill - RJC Group
Sandstone facade and arched entrance at The Scots College, Bellevue Hill NSW - RJC Group
Site Logo
Please wait...