- Supply and installation of 515 precision-cut sandstone pieces
- Development of 3D-modelled shop drawings and engineered structural fixing systems
- Offsite fabrication of sandstone using wire saw and CNC water-jet technology
- Installation of sandstone pieces onsite using stainless-steel mechanical and epoxy anchoring
- Use of lifting rigs for safe handling of stones ranging from 45 to 400 kilograms
- Delivering heritage stonemasonry within one of Sydney's busiest operational transport hubs with continuous public access
- Integrating sandstone installation with major infrastructure upgrade works and an active construction schedule
- Handling and installing stone elements weighing up to 400 kilograms within a constrained station environment
- Maintaining strict safety, heritage and compliance requirements across a live public infrastructure site
Sandstone elements were fabricated offsite using CNC water-jet technology to achieve the precision required for exact heritage matching. Installation was then coordinated carefully within the station environment using engineered fixing systems and lifting rigs to support safe handling and efficient delivery.
All works were carried out in line with heritage requirements while integrating with modern structural systems and the broader infrastructure works, ensuring the project met both conservation and construction expectations.
- 515 precision-cut sandstone pieces installed with exact heritage matching
- Enhanced structural resilience beneath a critical transport infrastructure node
- Seamless integration of heritage sandstone with modern structural systems
- Full compliance with safety, heritage and infrastructure project requirements throughout delivery
- No disruption to station operations during the works