- Provision of scaffolding and hoarding to support safe access and site management
- Replacement, dismantling and reuse of sandstone elements
- Indent repairs, mortar repairs, repointing, pinning and crack repairs to sandstone
- Cleaning, redressing and desalination of sandstone surfaces
- Removal of redundant fixings and installation of new lead weatherings
- Making good existing copper flashings and painting timber window frames
- Delivering remedial works within an operational school environment while maintaining safety for staff and students
- Matching repairs and replacement elements precisely to the existing heritage sandstone
- Coordinating access and scaffolding within a restricted school setting
- Managing a remedial scope spanning stone, flashings and associated heritage elements
RJC Group planned the works to suit the conditions of a live educational environment, with each repair methodology selected to address deterioration while maintaining consistency with the building’s original materials and detailing.
The scope combined stone repair, selective replacement and associated remedial works, requiring careful coordination across heritage treatment, material compatibility and site access. All works were carried out with a focus on safety, precision and long-term durability.
- Deteriorated sandstone elements repaired, stabilised and selectively replaced
- Heritage character preserved through careful material matching and sympathetic repair methods
- Associated remedial works completed across flashings, fixings and timber window frames
- Works delivered safely within an active school environment
- Long-term durability and performance of the Hallen Building’s heritage fabric improved