- Conservation and repair of stonework to the East and West Clerestories and flying buttresses
- Removal and reinstatement of copper downpipes using heritage-matched materials
- Installation of lead weatherings to parapets, cornices and tiered horizontal roof surfaces
- Removal of asbestos-containing pointing, elastomeric sealant and deteriorated stonework from joints
- Cleaning, dressing and desalination of sandstone
- Installation of stone indents for localised repairs
- Mortar repairs and repointing of open and cracked joints
- Delivering works within a fully operational cathedral with ongoing religious services and continuous public access
- Access to elevated and architecturally complex areas requiring specialised methodologies and equipment
- Safe removal of asbestos-containing materials within sensitive heritage fabric
- Maintaining consistency with original stone profiles, finishes and detailing across all repaired and restored elements
Works were staged around service schedules, access constraints and the operational requirements of the cathedral precinct. RJC Group coordinated closely with the Catholic Archdiocese of Sydney and other site stakeholders to manage access, sequencing, safety, noise and dust control throughout delivery.
All restoration works were delivered using methods aligned with heritage conservation principles, with repaired and reinstated elements carefully matched to the original materials to maintain visual consistency and support long-term structural integrity.
- Preserved intricate heritage detailing across key structural elements of the cathedral
- All works delivered without interruption to religious services or public access throughout the precinct
- Safe removal of hazardous materials and stabilisation of affected stonework
- Long-term protection and structural integrity of the cathedral’s historic masonry
- All works carried out in accordance with heritage conservation guidelines and the requirements of the Catholic Archdiocese of Sydney