- Scaffolding installation across more than 400 metres in three staged sections
- Removal of existing palisade fencing
- Installation of 350 plinth stones and sandstone columns
- Restoration of palisade fencing including base cutting, coating removal and stainless steel extension works
- Application of zinc-rich priming and Murobond Bridge paint to restored metalwork
- Reinstatement of fencing using traditional hot molten lead dressed to a rounded profile
- Delivering conservation works across a long linear heritage frontage within a highly prominent public setting
- Matching new stone and restored metal elements to the existing heritage character of the precinct
- Managing staged access and sequencing over a 12-month project timeline
- Delivering specialised reinstatement methods across both metal and stone elements
RJC Group carried out the works in stages across the full length of the site, with access, sequencing and restoration activities planned carefully to suit the scale and visibility of the location. The project combined stone reinstatement with detailed metal restoration, requiring consistency across material finishes, installation methods and heritage presentation throughout.
- 350 plinth stones and sandstone columns installed as part of the conservation works
- Palisade fencing restored and reinstated across a major heritage frontage
- Heritage character retained through traditional lead reinstatement methods
- Major works delivered successfully within a prominent public heritage setting