Client
The City of Sydney
Location
Sydney, NSW
Year Completed
2023
Duration
3 months
Project Type
Stonemasonry and Heritage Building Restoration

Frazer Memorial Fountain, Sydney

Project Overview

RJC Group delivered conservation works to the Frazer Memorial Fountain, a historically significant civic monument in Sydney. The project involved restoration of sandstone elements and preservation of the fountain's ornate architectural features, carried out in accordance with heritage conservation requirements and with minimal disruption to the surrounding public space.

  • Installation of new stone to match the existing heritage fabric
  • Hairline indenting to localised areas of deterioration
  • Desalination and dressing back of affected stonework
  • Mortar repairs and repointing of open and deteriorated joints
  • Repairs to existing lead weathering
  • Delivering conservation works within a publicly accessible environment while maintaining safe pedestrian access throughout
  • Preserving intricate Baroque heritage detailing and decorative features requiring a high level of craftsmanship and care
  • Matching all repaired and restored materials and finishes precisely to the existing heritage fabric

RJC Group applied careful conservation methods across the stone and lead repair scope, with all works carried out to maintain consistency with the fountain’s existing fabric and detailing. The project combined stone replacement, repair and finishing treatments within a focused three-month restoration period.

  • New stone elements integrated to match the existing fountain
  • Deteriorated stonework repaired and conserved across the monument
  • Detailed stone features preserved through careful restoration methods
  • Lead weathering repaired to support the long-term protection of the fountain
Scope of Works Arrow
  • Installation of new stone to match the existing heritage fabric
  • Hairline indenting to localised areas of deterioration
  • Desalination and dressing back of affected stonework
  • Mortar repairs and repointing of open and deteriorated joints
  • Repairs to existing lead weathering
Project Considerations Arrow
  • Delivering conservation works within a publicly accessible environment while maintaining safe pedestrian access throughout
  • Preserving intricate Baroque heritage detailing and decorative features requiring a high level of craftsmanship and care
  • Matching all repaired and restored materials and finishes precisely to the existing heritage fabric
Delivery & Approach Arrow

RJC Group applied careful conservation methods across the stone and lead repair scope, with all works carried out to maintain consistency with the fountain’s existing fabric and detailing. The project combined stone replacement, repair and finishing treatments within a focused three-month restoration period.

Key Outcomes Arrow
  • New stone elements integrated to match the existing fountain
  • Deteriorated stonework repaired and conserved across the monument
  • Detailed stone features preserved through careful restoration methods
  • Lead weathering repaired to support the long-term protection of the fountain
Restored sandstone column and arch interior detail at Frazer Memorial Fountain, Sydney - RJC Group conservation
Restored dome and intricate sandstone detailing at Frazer Memorial Fountain, Sydney - RJC Group conservation
Ornate Corinthian capital and sandstone arch detail at Frazer Memorial Fountain, Sydney - RJC Group stonemasonry
Fully restored Frazer Memorial Fountain exterior with dome and ornamental stonework, Sydney - RJC Group
Restored sandstone basin and ornate column detail inside Frazer Memorial Fountain, Sydney - RJC Group
Restored dome finial and heritage stonework at Frazer Memorial Fountain, Sydney - RJC Group stonemasonry
Site Logo
Please wait...