- Installation of new stone to match the existing heritage fabric
- Hairline indenting to localised areas of deterioration
- Desalination and dressing back of affected stonework
- Mortar repairs and repointing of open and deteriorated joints
- Repairs to existing lead weathering
- Delivering conservation works within a publicly accessible environment while maintaining safe pedestrian access throughout
- Preserving intricate Baroque heritage detailing and decorative features requiring a high level of craftsmanship and care
- Matching all repaired and restored materials and finishes precisely to the existing heritage fabric
RJC Group applied careful conservation methods across the stone and lead repair scope, with all works carried out to maintain consistency with the fountain’s existing fabric and detailing. The project combined stone replacement, repair and finishing treatments within a focused three-month restoration period.
- New stone elements integrated to match the existing fountain
- Deteriorated stonework repaired and conserved across the monument
- Detailed stone features preserved through careful restoration methods
- Lead weathering repaired to support the long-term protection of the fountain