- Removal and replacement of existing plinth stones
- Supply, profiling and installation of new sandstone plinth stones matched to existing heritage detail
- Removal of palisade fence sections for offsite refurbishment
- Shotblasting, priming and painting of metalwork prior to structural reinstallation
- Repair and cleaning of steps with replacement of worn stone elements
- Installation of new flashings and lead weathering to prevent water ingress
- Coordination of night works and pedestrian flows during peak tourist hours
- Delivering works within one of Sydney's busiest heritage and tourist precincts while maintaining continuous pedestrian access throughout
- Coordinating night works to minimise disruption during peak visitor hours
- Matching new sandstone plinth stones precisely to existing heritage profiles, finishes and detailing
- Managing offsite refurbishment and reinstatement of palisade sections within a tight programme
Works were staged and scheduled to maintain pedestrian access throughout the precinct, with night works used where necessary to minimise disruption during peak periods. RJC Group coordinated closely with the City of Sydney to manage access, site safety and work sequencing across each stage of the project.
All replacement stone and restored metal elements were matched carefully to the existing heritage fabric, ensuring the upgraded streetscape retained its visual character while improving durability and long-term performance.
- Preserved the historic integrity of a cherished heritage pathway and streetscape within The Rocks precinct
- Restored metalwork delivered with corrosion-resistant finishes ensuring long-term durability
- New profiled sandstone matched precisely to existing heritage profile and detailing
- Safe pedestrian access maintained throughout all stages of delivery
- Project delivered with minimal disturbance to public access and precinct operations